Concrete Pumping at a Southern Maine Substation

Looking back at Scott’s work at a Southern Maine substation, we’re reminded of the planning and coordination that go into a job like this. Active utility sites call for everyone on the job to stay aware of their surroundings and work together through each stage.

CMP and the contractor made safety the top priority. Their attention to the people on site and the work being done set the tone for the project, and Scott was glad to be part of that effort. It’s always good to see a complex job carried out with that level of care.

At Mainely Concrete Pumping, we know our role is one part of a larger operation. We take each pump with integrity: showing up ready, working with the people on site, and giving the job the attention it deserves. This Southern Maine project is one we’re proud to look back on.






